The West Valley Connector (WVC) project will be a 100% zero-emission Bus Rapid Transit (BRT) system, the first stage of the San Bernardino County zero-emission Bus Initiative and second BRT route in San Bernardino County.
Phase I of the project is 19 miles and will upgrade a portion of existing Route 61 which runs along Holt Boulevard, adding approximately 3.5 miles as center running, dedicated bus-only lanes. There will be 21 stations in Phase I that will provide an improved transit connection to Ontario International Airport (ONT) and help build transit connectivity by linking ONT, two Metrolink lines (San Bernardino and Riverside) and multiple major activity centers along the route including Ontario Mills and Victoria Gardens. Headways will be 10 minutes in the peak commute period and 15 minutes off-peak, providing a high level of service to the community.
Fact Sheets:
Traffic Pattern Change on Holt Boulevard Between Benson Avenue and Corona Avenue
A new traffic pattern is being implemented along Holt Boulevard as part of the West Valley Connector project and a permanent barrier is being installed along the center median at various locations. Drivers traveling in the same direction as their destination can still make right turns into driveways and side streets and left turns at signalized intersections. However, left turns into driveways and side streets between intersections will no longer be permitted. Drivers will use designated U-turn locations to access destinations from the opposite side of the street. This will remain the final roadway configuration upon project completion to support the future center-running bus rapid transit lanes.
The new traffic pattern is anticipated at the following locations during the approximate timeframes:

Follow posted signs and allow extra travel time as drivers adjust to the new traffic pattern.
Please know that construction is dynamic, and dates and times of specific activities can change.
Environmental Impact Report Addendum - August 2022
Final Environmental Document - Body
Final Environmental Document - Appendices
Finding of No Significant Impact
Responses to Comments on Draft Environmental Impact Report
Notice of Availability Final Environmental Impact Report (EIR)
Mitigation Monitoring and Reporting Program
Finding of Effect
Project Information English
Project Information Spanish
Air Quality Study
Air Quality Study - APPENDIX C
Biological Study Report
Community Impact Report
Cultural resources HPSR
Cultural resources ASR
Cultural resources HRER
Draft Relocation Impact Report
Energy Study
Floodplain Evaluation Report
Greenhouse Gas Emissions Study
Initial Site Assessment
Initial Site Assessment Addendum
Noise and Vibration Technical Study
Operations and Maintenance Facility Traffic Analysis
Paleontological Identification Report & Evaluation Report
Section 4(F) Evaluation
Traffic Operations Analysis
Visual Impact Report
Water Quality Report
Holt Boulevard Public Outreach Summary
Open House EIR Public Review - Public Outreach Summary
WVC Public Notice

Shop Local and Support the Businesses that Support Your Community
The West Valley Business Connector Program is designed to encourage the community to shop local during project construction. Participation is free for eligible businesses along the project route in the Cities of Ontario, Pomona, Montclair, and Rancho Cucamonga.
Participating businesses will be:
For more information, email info@goSBCTA.com or call 877-55-SBCTA
Official Rules Disclaimer:
There is no cost for businesses to participate. Benefits to local businesses include the following: social media and email marketing, and business/coupon promotions on the West Valley Connector Project website. For a business to be eligible, their physical address must fall within ¼-mile of the project corridor. In the first phase of this program, only impacted businesses along the project route in the City of Ontario are eligible for participation. Once construction of the new BRT stations begins later in 2024, businesses in the corridor cities of Pomona, Montclair, and Rancho Cucamonga will also be eligible for participation at no cost. SBCTA reserves the right to change, amend, extend, cancel or discontinue the program at any time, with no advance notice.